No edit summary
 
(9 intermediate revisions by 2 users not shown)
Line 26: Line 26:
* [[Bottom Disturbace|Bottom disturbance]] during construction
* [[Bottom Disturbace|Bottom disturbance]] during construction


Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]).
Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]).  


Go back to [[Categories and Layers#tab=Cables and pipelines|cables and pipelines]].
   
   
=North Sea=
=North Sea=
Line 54: Line 54:


===Methodology===
===Methodology===
Combined the different data sources and reprojected the data layer to Lambert Azimuthal Equal Area (EPSG:3035).
Based on the energy cables data combined from the sources mentioned above and the data regarding wind farms in operation, a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of  the platform's performance.  


=Baltic Sea=
=Baltic Sea=
Line 70: Line 70:
===Data Source===
===Data Source===


HELCOM HOLAS II Dataset: Cables (2018)
Based on the HELCOM HOLAS II Dataset: Cables (2018) data layer.


===Original Title===
===Original Title===
Line 84: Line 84:
For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index.
For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index.


Attribute specification and units
Attribute specification and units:


NAME
* NAME
 
* COUNTRY
COUNTRY
* CAPACITY (MW)
 
* STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown)
CAPACITY (MW)
* SOURCE"
 
STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown)
 
SOURCE"


Description retrieved from HELCOM's metadata page for this resource (2021-07-19).
Description retrieved from HELCOM's metadata page for this resource (2021-07-19).
Line 105: Line 101:


Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of  the platform's performance.
Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of  the platform's performance.
 
==Western Baltic Sea ==
The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with  that featured in the Baltic Sea edition.
=Clyde Marine Region=
=Clyde Marine Region=


==Types==
==Types==
None
 
* 150MW


==Metadata==
==Metadata==
===Data Source===
Not applicable. This data layer is only for planning purposes.
Enter data source for Clyde Marine Region here.
 
===Original Title===
 
Enter name of the layer at the source.
 
===Description===
Enter the description of the Clyde Marine Region dataset here.
 
===Creation Date===
yyyy-mm-dd Clyde Marine Region
 
===Methodology===
 
Enter here how the layer was prepared to be integrated into the MSP Challenge.


=Adriatic Sea=
=Adriatic Sea=
Line 140: Line 123:


==Metadata==
==Metadata==
===Data Source===
Not applicable. This data layer is only for planning purposes.
Enter data source for Adriatic Sea here.


===Original Title===


Enter name of the layer at the source.
=Eastern Mediterranean Sea=
==Types==
* 25MW
* 50MW
* 80MW
* 150MW
* 300MW
* 460MW


==Metadata==
Not applicable. This data layer is only for planning purposes.


===Description===
Enter the description of the Adriatic Sea dataset here.
===Creation Date===
yyyy-mm-dd Adriatic Sea
===Methodology===
Enter here how the layer was prepared to be integrated into the MSP Challenge.




<headertabs/>
<headertabs/>

Latest revision as of 14:28, 12 June 2024

Energy Cables
File:Layer Energy Cables.png
Layer Info
Category Activities
Sub-category Cables and pipelines

Description

Electricity or Energy Cables are essentially submarine power cables. Such a cable is a major transmission cable for carrying electric power below the surface of the water. The purpose of submarine power cables is the transport of electric current at high voltage. The electric core is a concentric assembly of inner conductor, electric insulation and protective layers. Modern three-core cables (e.g. for the connection of offshore wind turbines) often carry optical fibers for data transmission or temperature measurement, in addition to the electrical conductors.

MSP Challenge

Electricity Cables is a static data layer. They are point-by-point lines that you can draw in, edit or remove when making a plan.

Electricity Cables create the following pressures on the ecosystem:

Electricity Cables disallow all three fishing fleets (bottom trawl, drift and fixed nets, industrial and pelagic trawl).

Go back to cables and pipelines.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW

Metadata

Data Source

Rijkswaterstaat data drawn by hand to incorporate in a previous version of the MSP Challenge, combined with more up-to-date geographical information from Rijkswaterstaat as well.

Original Title

Not available.

Description

Not available.

Creation Date

Not available, data layer implemented in February 2018.

Methodology

Based on the energy cables data combined from the sources mentioned above and the data regarding wind farms in operation, a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW
  • 10GW Corridor

Metadata

Data Source

Based on the HELCOM HOLAS II Dataset: Cables (2018) data layer.

Original Title

Cables

Description

"The dataset was created in order to update the information regarding underwater cables in the Baltic Sea Region for the HELCOM Assessments. Data was collected by the HELCOM Secretariat during 2015 and 2016. The dataset contains information on submarine cables in the Baltic Sea. The dataset is based on available public sources on cables and due to variety of data sources (national and international), should be taken as general data based on best available public data with variable resolution over the different region in the Baltic. For Danish areas, the data represents constructions on Danish territorial waters, authorized facilities and activities from 2015. Depending on area, more accurate spatial data might exist, but data is unavailable for public use. National data submissions from Latvia and Russia were not available.

For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index.

Attribute specification and units:

  • NAME
  • COUNTRY
  • CAPACITY (MW)
  • STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown)
  • SOURCE"

Description retrieved from HELCOM's metadata page for this resource (2021-07-19).

Creation Date

2018-01-15

Methodology

Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance.

Western Baltic Sea

The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with that featured in the Baltic Sea edition.

Types

  • 150MW

Metadata

Not applicable. This data layer is only for planning purposes.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW

Metadata

Not applicable. This data layer is only for planning purposes.


Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW

Metadata

Not applicable. This data layer is only for planning purposes.


This page was last edited on 12 June 2024, at 14:28. Content is available under GPLv3 unless otherwise noted.