m (→Methodology) |
No edit summary |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 26: | Line 26: | ||
* [[Bottom Disturbace|Bottom disturbance]] during construction | * [[Bottom Disturbace|Bottom disturbance]] during construction | ||
Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]). | Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]). | ||
Go back to [[Categories and Layers#tab=Cables and pipelines|cables and pipelines]]. | |||
=North Sea= | =North Sea= | ||
Line 70: | Line 70: | ||
===Data Source=== | ===Data Source=== | ||
HELCOM HOLAS II Dataset: Cables (2018) | Based on the HELCOM HOLAS II Dataset: Cables (2018) data layer. | ||
===Original Title=== | ===Original Title=== | ||
Line 84: | Line 84: | ||
For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index. | For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index. | ||
Attribute specification and units | Attribute specification and units: | ||
NAME | * NAME | ||
* COUNTRY | |||
COUNTRY | * CAPACITY (MW) | ||
* STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown) | |||
CAPACITY (MW) | * SOURCE" | ||
STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown) | |||
SOURCE" | |||
Description retrieved from HELCOM's metadata page for this resource (2021-07-19). | Description retrieved from HELCOM's metadata page for this resource (2021-07-19). | ||
Line 105: | Line 101: | ||
Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | ||
==Western Baltic Sea == | |||
The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with that featured in the Baltic Sea edition. | |||
=Clyde Marine Region= | =Clyde Marine Region= | ||
==Types== | ==Types== | ||
* 150MW | |||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Adriatic Sea= | =Adriatic Sea= | ||
Line 140: | Line 123: | ||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Eastern Mediterranean Sea= | |||
==Types== | |||
* 25MW | |||
* 50MW | |||
* 80MW | |||
* 150MW | |||
* 300MW | |||
* 460MW | |||
==Metadata== | |||
Not applicable. This data layer is only for planning purposes. | |||
<headertabs/> | <headertabs/> |
Latest revision as of 14:28, 12 June 2024
This page was last edited on 12 June 2024, at 14:28. Content is available under GPLv3 unless otherwise noted.