m (→Data Source) |
No edit summary |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 101: | Line 101: | ||
Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | ||
==Western Baltic Sea == | |||
The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with that featured in the Baltic Sea edition. | |||
=Clyde Marine Region= | =Clyde Marine Region= | ||
==Types== | ==Types== | ||
* 150MW | |||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Adriatic Sea= | =Adriatic Sea= | ||
Line 136: | Line 123: | ||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Eastern Mediterranean Sea= | |||
==Types== | |||
* 25MW | |||
* 50MW | |||
* 80MW | |||
* 150MW | |||
* 300MW | |||
* 460MW | |||
==Metadata== | |||
Not applicable. This data layer is only for planning purposes. | |||
<headertabs/> | <headertabs/> |
Latest revision as of 14:28, 12 June 2024
This page was last edited on 12 June 2024, at 14:28. Content is available under GPLv3 unless otherwise noted.