(Added EMS tab) |
(→Types: Added more context in EMS) |
||
| (2 intermediate revisions by one other user not shown) | |||
| Line 101: | Line 101: | ||
Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | ||
==Western Baltic Sea == | |||
The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with that featured in the Baltic Sea edition. | |||
=Clyde Marine Region= | =Clyde Marine Region= | ||
| Line 126: | Line 127: | ||
=Eastern Mediterranean Sea= | =Eastern Mediterranean Sea= | ||
There is no information available about existing electricity cables in the Eastern Mediterranean Sea. This layer is only included for planning purposes. | |||
==Types== | ==Types== | ||
* 25MW | * 25MW | ||
Revision as of 09:45, 3 December 2024
This page was last edited on 3 December 2024, at 09:45. Content is available under GPLv3 unless otherwise noted.
Co-funded by the European Union.