Electrical or Power Cables are essentially submarine power cables. Such a cable is a major transmission cable for carrying electric power below the surface of the water. The purpose of submarine power cables is the transport of electric current at high voltage. The electric core is a concentric assembly of inner conductor, electric insulation and protective layers. Modern three-core cables (e.g. for the connection of offshore wind turbines) often carry optical fibers for data transmission or temperature measurement, in addition to the electrical conductors. | |||
==MSP Challenge== | ==MSP Challenge== | ||
Power Cables is a static data layer. They are point-by-point lines that you can draw in, edit or remove when making a plan. | |||
Electrical Cables create the following pressures on the ecosystem: | |||
* [[Artificial Substrate|Artificial substrate]] | * [[Artificial Substrate|Artificial substrate]] | ||
| Line 26: | Line 26: | ||
* [[Bottom Disturbace|Bottom disturbance]] during construction | * [[Bottom Disturbace|Bottom disturbance]] during construction | ||
Power Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]). | |||
Go back to [[Categories and Layers#tab=Cables and pipelines|cables and pipelines]]. | |||
=North Sea= | =North Sea= | ||
| Line 42: | Line 42: | ||
==Metadata== | ==Metadata== | ||
===Data Source=== | ===Data Source=== | ||
Rijkswaterstaat data drawn by hand to incorporate in a previous version of the MSP Challenge, combined with more up-to-date geographical information from Rijkswaterstaat as well. | |||
===Original Title=== | ===Original Title=== | ||
Not available. | |||
===Description=== | ===Description=== | ||
Not available. | |||
===Creation Date=== | ===Creation Date=== | ||
Not available, data layer implemented in February 2018. | |||
===Methodology=== | ===Methodology=== | ||
Based on the electrical cables data combined from the sources mentioned above and the data regarding wind farms in operation, a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | |||
=Baltic Sea= | =Baltic Sea= | ||
| Line 70: | Line 70: | ||
===Data Source=== | ===Data Source=== | ||
HELCOM HOLAS II Dataset: Cables (2018) | Based on the HELCOM HOLAS II Dataset: Cables (2018) data layer. | ||
===Original Title=== | ===Original Title=== | ||
| Line 84: | Line 84: | ||
For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index. | For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index. | ||
Attribute specification and units | Attribute specification and units: | ||
NAME | * NAME | ||
* COUNTRY | |||
COUNTRY | * CAPACITY (MW) | ||
* STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown) | |||
CAPACITY (MW) | * SOURCE" | ||
STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown) | |||
SOURCE" | |||
Description retrieved from HELCOM's metadata page for this resource (2021-07-19). | Description retrieved from HELCOM's metadata page for this resource (2021-07-19). | ||
| Line 105: | Line 101: | ||
Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance. | ||
==Western Baltic Sea == | |||
The Cables & Pipelines layer in the Western Baltic Sea Edition remains consistent with that featured in the Baltic Sea edition. | |||
=Clyde Marine Region= | =Clyde Marine Region= | ||
==Types== | ==Types== | ||
* 150MW | |||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Adriatic Sea= | =Adriatic Sea= | ||
| Line 140: | Line 123: | ||
==Metadata== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
=Eastern Mediterranean Sea= | |||
There is no information available about existing electrical cables in the Eastern Mediterranean Sea. This layer is only included for planning purposes. | |||
==Types== | |||
* 25MW | |||
* 50MW | |||
* 80MW | |||
* 150MW | |||
* 300MW | |||
* 460MW | |||
== | ==Metadata== | ||
Not applicable. This data layer is only for planning purposes. | |||
<headertabs/> | <headertabs/> | ||
Latest revision as of 08:49, 4 November 2025
This page was last edited on 4 November 2025, at 08:49. Content is available under GPLv3 unless otherwise noted.
Co-funded by the European Union.