No edit summary |
No edit summary |
||
Line 29: | Line 29: | ||
* [[Bottom Disturbace|Bottom Disturbace]] during construction only | * [[Bottom Disturbace|Bottom Disturbace]] during construction only | ||
Telecom Cables disallow the [[Bottom Trawl Catch|bottom trawl fishing]] fleet only. During construction the other two fishing fleets ([[Industrial and Pelagic Trawl Catch|Industrial and Pelagic Trawl Catch]] and [[Drift and Fixed Nets Catch|Drift and Fixed Nets Catch]]) are also disallowed. | Telecom Cables disallow the [[Bottom Trawl Catch|bottom trawl fishing]] fleet only. During construction, the other two fishing fleets ([[Industrial and Pelagic Trawl Catch|Industrial and Pelagic Trawl Catch]] and [[Drift and Fixed Nets Catch|Drift and Fixed Nets Catch]]) are also disallowed. | ||
Return to [[Categories_and_Layers#tab=Cables_and_pipelines|cables and pipelines]] | |||
=North Sea= | =North Sea= |
Revision as of 14:37, 13 June 2022
This page was last edited on 13 June 2022, at 14:37. Content is available under GPLv3 unless otherwise noted.