Line 26: Line 26:
* [[Bottom Disturbace|Bottom disturbance]] during construction
* [[Bottom Disturbace|Bottom disturbance]] during construction


Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]).
Electricity Cables disallow all three fishing fleets ([[Bottom Trawl Catch|bottom trawl]], [[Drift and Fixed Nets Catch|drift and fixed nets]], [[Industrial and Pelagic Trawl Catch|industrial and pelagic trawl]]).  


Go back to [[cables and pipelines]].
   
   
=North Sea=
=North Sea=

Revision as of 14:30, 14 June 2022

Energy Cables
File:Layer Energy Cables.png
Layer Info
Category Activities
Sub-category Cables and pipelines

Description

Electricity or Energy Cables are essentially submarine power cables. Such a cable is a major transmission cable for carrying electric power below the surface of the water. The purpose of submarine power cables is the transport of electric current at high voltage. The electric core is a concentric assembly of inner conductor, electric insulation and protective layers. Modern three-core cables (e.g. for the connection of offshore wind turbines) often carry optical fibers for data transmission or temperature measurement, in addition to the electrical conductors.

MSP Challenge

Electricity Cables is a static data layer. They are point-by-point lines that you can draw in, edit or remove when making a plan.

Electricity Cables create the following pressures on the ecosystem:

Electricity Cables disallow all three fishing fleets (bottom trawl, drift and fixed nets, industrial and pelagic trawl).

Go back to cables and pipelines.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW

Metadata

Data Source

Rijkswaterstaat data drawn by hand to incorporate in a previous version of the MSP Challenge, combined with more up-to-date geographical information from Rijkswaterstaat as well.

Original Title

Not available.

Description

Not available.

Creation Date

Not available, data layer implemented in February 2018.

Methodology

Based on the energy cables data combined from the sources mentioned above and the data regarding wind farms in operation, a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW
  • 10GW Corridor

Metadata

Data Source

HELCOM HOLAS II Dataset: Cables (2018)

Original Title

Cables

Description

"The dataset was created in order to update the information regarding underwater cables in the Baltic Sea Region for the HELCOM Assessments. Data was collected by the HELCOM Secretariat during 2015 and 2016. The dataset contains information on submarine cables in the Baltic Sea. The dataset is based on available public sources on cables and due to variety of data sources (national and international), should be taken as general data based on best available public data with variable resolution over the different region in the Baltic. For Danish areas, the data represents constructions on Danish territorial waters, authorized facilities and activities from 2015. Depending on area, more accurate spatial data might exist, but data is unavailable for public use. National data submissions from Latvia and Russia were not available.

For 2018 version of dataset, cables that have only approximate location were removed from the dataset, as the spatial accuracy of these objects is not sufficient for the scale of the index.

Attribute specification and units

NAME

COUNTRY

CAPACITY (MW)

STATUS (Operational, Under Construction, Application Submitted, Planned, Unknown)

SOURCE"

Description retrieved from HELCOM's metadata page for this resource (2021-07-19).

Creation Date

2018-01-15

Methodology

Based on the "Cables" and the "Wind farms" layers a model for the renewable energy scenario in 2016 was created. Only the cables that would be needed to bring the energy from the wind farms to shore are taken into account in the plafform as energy cables. Some geometries might have been simplified for optimization of the platform's performance.

Types

None

Metadata

Data Source

Enter data source for Clyde Marine Region here.

Original Title

Enter name of the layer at the source.

Description

Enter the description of the Clyde Marine Region dataset here.

Creation Date

yyyy-mm-dd Clyde Marine Region

Methodology

Enter here how the layer was prepared to be integrated into the MSP Challenge.

Types

  • 25MW
  • 50MW
  • 80MW
  • 150MW
  • 300MW
  • 460MW

Metadata

Data Source

Enter data source for Adriatic Sea here.

Original Title

Enter name of the layer at the source.


Description

Enter the description of the Adriatic Sea dataset here.

Creation Date

yyyy-mm-dd Adriatic Sea

Methodology

Enter here how the layer was prepared to be integrated into the MSP Challenge.


This page was last edited on 14 June 2022, at 14:30. Content is available under GPLv3 unless otherwise noted.