Cables that were planned to serve the planned wind farms (from the layer "Potential Wind Farms (RI.SE)")

MSP Challenge

This layer is for information purposes only; it can help deciding which areas to give preference when planning for new wind parks.

In this tab, extended content is placed

In this tab, visual content is placed

Data Source

Baltic LINes project output provided directly by the project's partners (SwAM, RI.SE). For more info see the full report here)

Original Title

Transmission Lines

Description

Cables to connect the planned wind farms to the energy grid in the scenarios developed during the Baltic LINes project .

Creation Date

Not available. Data received on 2018-09-12.

Methodology

Reprojected the geodata layer to Lambert Azimuthal Equal Area (EPSG:3035).