(Correction of the EMS information) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 18: | Line 18: | ||
==MSP Challenge== | ==MSP Challenge== | ||
For the purpose of the MSP Challenge, users can plan for converter stations to optimize the number | For the purpose of the MSP Challenge, users can plan for converter stations to optimize the number of cables to transport the energy to shore. The AC or DC types of cables are not taken into account, but the capacity (in watt) of the cables is. | ||
Converter stations do not contribute to pressures on the ecosystem. | |||
Return to [[Categories and Layers#tab=Energy|energy]]. | |||
=North Sea= | =North Sea= | ||
Line 35: | Line 40: | ||
==Metadata== | ==Metadata== | ||
Not applicable. The existing | Not applicable. The existing converter stations were placed based on rough estimations or energy model requirements. | ||
=Clyde Marine Region= | = Clyde Marine Region = | ||
==Types== | ==Types== | ||
* 400MW | |||
==Metadata== | ==Metadata== | ||
Not applicable. At the moment of development of the Clyde Marine Region edition there was no offshore energy production in the region. This layer exists just for planning purposes. | |||
=Adriatic Sea= | =Adriatic Sea= | ||
Line 67: | Line 58: | ||
==Metadata== | ==Metadata== | ||
Not applicable. | |||
At the moment of development of the Adriatic Sea edition there was no offshore energy production in the region. This layer exists just for planning purposes. | |||
= Eastern Mediterranean Sea = | |||
==Types== | |||
* 400MW | |||
* 800MW | |||
==Metadata== | |||
Not applicable. | |||
At the moment of development of the Eastern Mediterranean Sea edition there was no offshore energy production in the region. This layer exists just for planning purposes. | |||
<headertabs/> | <headertabs/> |
Revision as of 12:25, 4 April 2023
This page was last edited on 4 April 2023, at 12:25. Content is available under GPLv3 unless otherwise noted.