(Created page with "=General Information= {{Infobox | title = {{PAGENAME}} | image = 200px | headerstyle = background:#595958; color:#f9f9f9;...")
 
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
  | headerstyle  =  background:#595958; color:#f9f9f9;
  | headerstyle  =  background:#595958; color:#f9f9f9;
  | header1 = Layer Info
  | header1 = Layer Info
  |  label2 = Category |  data2 = Activities/Cables and pipelines
  |  label2 = Category |  data2 = Activities
  |  label3 = Editable |  data3 = Yes
|  label3 = Subcategory |  data3 = Cables and pipelines
  |  label4 = Data type |  data4 = Lines
  |  label4 = Editable |  data4 = Yes
  |  label5 = Data type |  data5 = Lines
  | header9 = Types or Values
  | header9 = Types or Values
   
   
Line 22: Line 23:
===Description===
===Description===


Cables that were planned to serve the planned wind farms
Cables that were planned to serve the planned wind farms (from the layer "Potential Wind Farms (RI.SE)")


===MSP Challenge===
===MSP Challenge===


Here you can add information about how the layer is implemented or used in the MSP Challenge
This layer is for information purposes only; it can help deciding which areas to give preference when planning for new wind parks.
   
   
=Additional Information=
=Additional Information=
   
   
'''IN THIS TAB EXTENDED CONTENT IS PLACED'''
''In this tab, extended content is placed''
   
   
=Visuals=
=Visuals=
'''ON THIS TAB VISUAL CONTENT IS PLACED'''
''In this tab, visual content is placed''


=Metadata=
=Metadata=
===Data Source===
===Data Source===
'''Coming soon'''
Baltic LINes project output provided directly by the project's partners (SwAM, RI.SE). For more info see the full report [https://vasab.org/wp-content/uploads/2019/05/Baltic-LINes-2030-and-2050-Baltic-Sea-Energy-Scenarios.pdf here])
===Last Update===
 
'''Coming soon'''
===Original Title===
Transmission Lines
 
===Description===
Cables to connect the planned wind farms to the energy grid in the scenarios developed during the Baltic LINes project  .
 
===Creation Date===
Not available. Data received on  2018-09-12.
===Methodology===
===Methodology===
'''Coming soon'''
Reprojected the geodata layer to Lambert Azimuthal Equal Area (EPSG:3035).
<headertabs/>
<headertabs />

Latest revision as of 15:01, 19 July 2021

Potential Cables (RI.SE)
File:Layer Potential Cables (RI.SE).png
Layer Info
Category Activities
Subcategory Cables and pipelines
Editable Yes
Data type Lines
Types or Values
2025
2030
2035
2040
2045
2050

Description

Cables that were planned to serve the planned wind farms (from the layer "Potential Wind Farms (RI.SE)")

MSP Challenge

This layer is for information purposes only; it can help deciding which areas to give preference when planning for new wind parks.

In this tab, extended content is placed

In this tab, visual content is placed

Data Source

Baltic LINes project output provided directly by the project's partners (SwAM, RI.SE). For more info see the full report here)

Original Title

Transmission Lines

Description

Cables to connect the planned wind farms to the energy grid in the scenarios developed during the Baltic LINes project .

Creation Date

Not available. Data received on 2018-09-12.

Methodology

Reprojected the geodata layer to Lambert Azimuthal Equal Area (EPSG:3035).

This page was last edited on 19 July 2021, at 15:01. Content is available under GPLv3 unless otherwise noted.